江苏快3

  • Warehouse Steel Frame, Steel Structure Warehouse Shed Warehouse Steel Frame, Steel Structure Warehouse Shed

Steel Structure Warehouse Shed

  • Place of origin : Guangdong,China
  • Model Number : steel structure warehouse08
  • Price Terms : FOB price
  • Payment Terms : By T/T
  • Package : Seaworthy
  • Minimum Order : 1 set
  • Delivery Time : 30-45 days
  • Brand Name : SBS

江苏快3

Steel Structure Warehouse Shed

Steel-Structure-Warehouse-Shed-1.jpg

 

1.Steel Structure material introduction

Steel-Structure-Warehouse-Shed-2.jpg

C steel was processed after hot rolling and cold bending. Its characteristics are: thin wall, light weight, good cross section performance, high strength (compared with the traditional steel) and can save 30% materials compared with the equivalent steel.


C type steel is widely used in purlin and wall beam steel structure building, also can combined into lightweight roof, carrier construction, etc. In addition, it can also be used for machinery and column, beam and arm light industrial manufacturing.

2.Provide data

Item Name

江苏快3 Steel structure building

Size

Length, Width, Roof height and Eave Height

江苏快3 Roof and Wall

PU, EPS, Rock Wool sandwich panel

Door and Window

PVC or Aluminum Alloy

Column and Beam

江苏快3 Hot rolled H section , I section or Galvanized

Purlin

江苏快3 C-Section and Z-section

Surface

2 primer and 1 finished paint

江苏快3 Local Climate

1. wind speed  2. Rain load  3. Snow load  4. Earthquake grade if any, etc.

江苏快3 Crane parameter

江苏快3 If need crane beam, parameter is in need.

Drawing

1. Quote as clients' drawing 
江苏快3 2. Design as per clients' requests.

江苏快3 Package

In container or as per requests.

江苏快3 Load in

江苏快3 20 ft', 40 ft' GP, /HQ/OT container

 

3.Transportation

江苏快3 Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:

江苏快3 1). Seaworthy

江苏快3  In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size      to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.

Transportant_1

江苏快3   2).Package for the steel frame

If you want to use the 40 HQ container to transportation the whole steel structure product. You can do the steel frame to package ,use the cable wire to fix. But you must paid for the steel frame and baling charges.

Package-_

 

4.Advantages

1) Features: fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
2) Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
3) Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
4) Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
5) Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads.
江苏快3 Due to the above advantages, combination of light china steel building structures in construction engineering, railway, petrochemical industry, water conservancy construction highway construction and military engineering and earthquake relief in the fields of temporary is widely used in construction.

Design_

The intent of this Provision is to ensure that the end connections of the brace test specimen reasonably represent those of the prototype. It is possible that due to fabrication or assembly constraints variations in fit-up, faying-surface preparation, or bolt or pin hole fabrication and size may occur. In certain cases, such variations may not be detrimental to the qualification of a successful cyclic test. The final acceptability of variations in brace-end connections rests on the opinion of the building official.
 
Example Brace Testing Protocol
 

                                                    Example Brace Testing Protocol

Cycle

Deformation

Inelastic Deformation

Cumulative Inelastic Deformation

2 @ Äby

江苏快3  

= 2*4*(Äby − Äby) = 0Äby

0Äby = 0Äby

江苏快3 2 @ 1/2Äbm

江苏快3 = 4 @ 2.0Äby

江苏快3 = 2*4*(2.0Äby − Äby) = 8Äby

0Äby + 8Äby = 8Äby

2 @ Äbm

江苏快3 = 4 @ 4.0Äby

江苏快3 = 2*4*(4.0Äby − Äby) = 24Äby

8Äby + 24Äby = 32Äby

江苏快3 2 @ 11/2Äbm

= 2 @ 6.0Äby

= 2*4*(6.0Äby − Äby) = 40Äby

32Äby + 40Äby = 72Äby

江苏快3 2 @ 2Äbm

江苏快3 = 2 @ 8.0Äby

= 2*4*(8.0Äby − Äby) = 56Äby

72Äby + 56Äby = 128Äby

4 @ 11/2Äbm

江苏快3 = 2 @ 6.0Äby

= 4*4*(6.0Äby − Äby) = 80Äby

128Äby + 80Äby = 208Äby

Cumulative inelastic deformation at end of protocol = 208Äby

5.Company Profile:

Foshan Shengbang Steel Structure Co., Ltd.Possesses professional large-scale steel structure production equipments and the automatic spraying production 
line, so we can satisfy the different customers demand.We takes "build your future" as mission and takes company growth as premise.The company has trained many 
high quality marketing personnel, professional technician and construction workers.We take the customers' demand as the guidances, then provide reasonable, 
江苏快3 scientific and effective solution for customers.We regard practical growth, innovationand group solidarity as our company spirit, so that we can offer all round service to customers.

company-introduction

Recommended products

top
v

contact us

contact-email
contact-logo

江苏快3DAMS Incorporated

We provide customers with quality products and provide high-quality services

看不清,请点击我!

If you would like to leave us a comment please go to contact us

contact-clo
var _hmt = _hmt || []; (function() { var hm = document.createElement("script"); hm.src = "https://hm.baidu.com/hm.js?be055eb5acfdc25d3bd72279b8418725"; var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(hm, s); })();